CIA • 1964
STANDARD INSPECTION PROCEDURE FOR FLARE, FUSEE TYPE SEQUENTIAL BURNING RED, GREEN AND YELLOW
A roved For Release 2001/03/3 ;A A,~R.~c~ pp '-I~QF~~1~.06311AOQQ~100150003-2 DATE 18 May 196. APPENDIX; STANDARD INSPECTION PROCEDURE FOR FLARE, FUSEE TYPE SEQUENTIAL BtTRNING RED, GREEN AND YELLOW (1370-H00-795p) (1370-H0o-8786) (1370-Ii0o-8787) 1? Technical: This item consists of three separate, modified, railroad-type fusee flares that may be utilized in a one, two, or maximum three-unit sectionalized assembly fo:r drop zone authentication. The sequential burning time varies from approximate...
C
Declassified
Timeline
- Created
- Dec 9, 2016
- Released
- Nov 20, 2000
- Publication
- May 18, 1964
- Case number
- —
Files
Download the original PDF or open the CIA Reading Room entry if available.
Sign in to save this dossier to your favorites. Log in
Discussion & Notes
Capture takeaways or see what other researchers found.
Sign in to start a private notebook for this dossier.
Sign in to add notesSign in to view the Intelligence Graph.
Metadata
Document #
CIA-RDP78-06311A000100150003-2
Case #
—
Document Type
CREST
Collection
General CIA Records
Release Decision
RIPPUB
Original Classification
C
Sequence
3
Pages
6 pages
File Size
278.49 KB